This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: a. Ductile Iron Pipe C40 EN545 Tyton Ø6” – Total Length: 4,600 meters b. HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 11,022 meters, with varying diameters c. 1) Concrete Water Tanks: • (10m x 8m x 2.1m) • (10m x 8m x 2.1m) 2- Pump Chamber & Electrical Works: a. Installation of a dedicated pump chamber and associated electrical systems to support operations
This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines. The scope includes: Pipeline Network: a. HDPE Pipe PE100 SDR11 TWPASS1075 Diameter 160mm Length: 26,850 meters. b. HDPE Pipe PE100 SDR11 TWPASS1075 Diameter 110mm Length: 18,150 meters.
This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: a. Ductile Iron Pipe C40 EN545 Tyton Ø6” – Total Length: 4,600 meters b. HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 11,022 meters, with varying diameters c. 1) Concrete Water Tanks: • (10m x 8m x 2.1m) • (10m x 8m x 2.1m) 2- Pump Chamber & Electrical Works: a. Installation of a dedicated pump chamber and associated electrical systems to support operations
This project includes: a pipeline, a pipe network, Borewell drilling, the installation of pumps, a pump chamber and electrical works. 1- HDPE Pipe PE 100 SDR 11 TWPASS1075 Length=1,925m with varying diameters. 2- Borewell drilling, depth=250m 3- Submersible Pump
This project is divided into six components: Perkin, Darbandok, Knak, Alana, Sreshma and Shorsh Brayati. These components consist of a pipeline, a pipe network, a concrete water tank, the installation of pumps, a pump chamber and electrical works. 1. Ductile Pipe C40 EN545 Tyton Ø 6” Length =1,500m 2. HDPE Pipe PE 100 SDR 11 TWPASS1075 Length=17,695m with varying diameters. 3. Water Concrete Tank (16x10x3) m 4. Water Concrete Tank (10x8x2) m 5. Water Concrete Tank (9x8x2) m 6. Submersible Pump
This project includes: a pipeline, a pipe network, a concrete water tank, the installation of pumps, a pump chamber and electrical works. 1- HDPE Pipe PE 100 SDR 11 TWPASS1075 Length=8,300m with varying diameters. 2- Water Concrete Tank (15x15x2.4) m 3- Submercible Pump
Construction of a new water intake structure and renovation of existing components to improve water collection, flow efficiency, and system reliability.
Rehabilitation of the existing water supply infrastructure, including pipelines, valves, and distribution components, to enhance system efficiency and reduce losses. The project also involves the refurbishment of the booster pump station, including mechanical, electrical, and control systems, to ensure reliable water pressure and continuous supply to end users. This project includes: 1- Pipeline length = 5,000 m with vary diameter. 2- Valves 80 pics.
Supply and installation of a GRP (Glass Reinforced Plastic) tank along with UPVC pipes in sizes 100mm, 400mm, and 600mm. The work includes delivery, placement, and proper connection of the tank and piping system for reliable water storage and distribution.
Ninawa - Sinjar
Rehabilitation and Repair of Drainage Network involves restoring and fixing damaged or aging drainage systems to ensure proper water flow and prevent flooding. It includes cleaning, repairing pipes, replacing broken parts, and upgrading infrastructure to improve drainage efficiency and protect the environment
Supply and installation of a chemical dosing pump for alum involves providing the appropriate dosing pump equipment and professionally installing it to accurately inject alum into a water treatment process for coagulation and purification.
Rehabilitation of the Salamya Water Treatment Plant involves upgrading and repairing the existing infrastructure, equipment, and systems to improve water quality, increase efficiency, and ensure reliable operation. This includes restoring treatment units, replacing outdated components, and enhancing overall plant performance.
Rehabilitation of the water distribution network, involving the replacement of an existing pipeline with a 200mm diameter PE (polyethylene) pipe over a total length of 15,400 meters. The work includes excavation, pipe laying, connection to the existing network, testing, and backfilling, aiming to improve water flow efficiency, reduce leakage, and ensure long-term system reliability. Rehabilitation of the water distribution network, involving the replacement of an existing pipeline with a 200mm diameter PE (polyethylene) pipe over a total length of 15,400 meters. The work includes excavation, pipe laying, connection to the existing network, testing, and backfilling, aiming to improve water flow efficiency, reduce leakage, and ensure long-term system reliability.
Rehabilitation of the existing drainage network to restore full functionality, improve stormwater management, and prevent flooding. The scope includes cleaning, repairing, replacing damaged sections, upgrading pipelines, manholes, and associated infrastructure to ensure efficient water flow and long-term durability.
Rehabilitation of the water distribution network, involving the replacement of an existing pipeline with a 200mm diameter PE (polyethylene) pipe over a total length of 15,400 meters. The work includes excavation, pipe laying, connection to existing network, testing, and backfilling, aiming to improve water flow efficiency, reduce leakage, and ensure long-term system reliability.