Rehabilitation of the existing water supply infrastructure, including pipelines, valves, and distribution components, to enhance system efficiency and reduce losses. The project also involves the refurbishment of the booster pump station, including mechanical, electrical, and control systems, to ensure reliable water pressure and continuous supply to end users. This project includes:
1- Pipeline length = 5,000 m with vary diameter.
2- Valves 80 pics.