This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes:
1- Pipeline Network:
a. Ductile Iron Pipe C40 EN545 Tyton Ø6” – Total Length: 4,600 meters
b. HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 11,022 meters, with varying diameters
c.
1) Concrete Water Tanks:
• (10m x 8m x 2.1m)
• (10m x 8m x 2.1m)
2- Pump Chamber & Electrical Works:
a. Installation of a dedicated pump chamber and associated electrical systems to support operations