Open one side along the T-walls, construct a reinforced concrete column to support the wing gate, transfer materials from the DD warehouse, and close the two open sides of the T-walls room with the BPF area fence, manufacturing and installing a steel gate.
This project involves civil maintenance, fencing repair, and general improvement activities at the FSK water well site. The key scope includes: · Site visit for verification prior to starting any activities. · Permit to Work (PTW) to be secured before commencement. · Planning and procurement of all required civil materials. · Clearing grass and vegetation, followed by the application of 3 cm thick crushed gravel around the building perimeter. ·Painting internal and external building walls with emulsion paint. · Painting the building gates with waterproof paint. · Removal of the existing chain-link fence, with transportation to the TWK scrap yard. · Cleaning existing fence posts using brushes, then painting all posts and the entrance gate. · Installation of new wire mesh fencing in place of the removed mesh. · Supply and installation of two padlocks with chains on the building gate.
The scope of work includes earth preparation, subbase construction, and liner replacement for the designated pit area and access road, as per the provided layout. Key activities include: · Grading, leveling, and compaction of the highlighted area and pit access road. · Laying 15 cm of subbase Type A, compacted to achieve 95% Maximum Dry Density (MDD). · Laying 2 cm of crushed gravel, compacted over the same areas for surface finishing. · Cutting and removing the existing liner, including transportation to the DNO scrap yard. · Supply and installation of a new 2mm liner, with all necessary inspections and tests to be witnessed and approved by DNO QA/QC before final handover. · Construction of a 50cm high subbase berm along the west side of the pit, as shown in the layout.
This project involves the fabrication and installation of two main components: 1. Smoking Shelter – Design, fabricate, and install a durable and weather-resistant smoking shelter, ensuring compliance with safety and local regulatory standards. The shelter will include roofing, partial side panels, seating, and signage as required. 2. Small Container Unit – Supply and install a compact container unit measuring 2m x 2m x 2.4m, suitable for use as a storage or utility space. The container will be fabricated with structural steel, properly insulated (if required), and equipped with basic electrical and ventilation provisions according to project needs.
This is to certify that Wealth Oil Company has successfully delivered the GM Electrical Materials for BSQ to NLS Yard, Gazna Road (near 120 Meter Road, next to old Coca-Cola, Erbil), in accordance with the above work order. Baeshiqa PSC DNO Iraq AS NLS Yard Gazna Road (near 120 Mtr Rd, next to old Coca-Cola) Erbil
Replace hinges, rubbers, shafts, large retraining nuts, and bearings for all gates, for any defected part welding required, for each gate repairing work crane with a proper lifting plan required, and 100% MPI required on all platform structure weld joints, painting of all structures.
Fabricate and install sleeve pipes. Construct a concrete basement for both side walls. Building a masonry wall for both sides of the crossover, backfilling using an approved subbase gravel type (A), pouring plain concrete, and finishing the concrete face.
Supply of Materials for Land-Based Survey (LBS) – Defect Repairs We are providing materials necessary for carrying out land-based survey defect repairs, which include the following items: 1. Riprap Rocks Size: 20 × 15 × 0.7 m Size: 20 × 30 × 0.5 m Size: 20 × 15 × 0.5 2. Pipes and Protection Ductile Iron Pipe – Diameter: 36” HDPE Pipes – Diameters: 125 mm and 110 mm Rock Shield – For pipeline protection 3. Gabions Size: 1 × 2 × 1 m 4. Sub-base Material Type A and Type B – For foundation and backfilling 5. Boulders Various sizes for slope stabilization, embankment protection, or foundation support
Project Description: Provision of reliable transportation services for goods and materials, ensuring safe, timely, and efficient delivery using low beds, high beds, cranes, and box trailers across various locations.
Provision of reliable transportation services for goods and materials, ensuring safe, timely, and efficient delivery using low beds, high beds, cranes, and box trailers across various locations.
Provision of reliable transportation services for goods and materials, ensuring safe, timely, and efficient delivery using low beds, high beds, cranes, and box trailers across various locations.
This project includes provision of equipment and preparation of a site and construction of a camp, road, car park, petrol station, and magazine. Provision of Heavy Equipment: Dozer—A powerful tracked machine used for pushing earth, clearing land, and site preparation. Excavator—Versatile digging equipment ideal for trenching, demolition, and material handling. Front-End Loader – Used for loading, lifting, and moving materials like soil, gravel, and debris. Roller – Compaction equipment for leveling and compressing soil, asphalt, or gravel surfaces. Grader – Precision machine used for fine grading, leveling surfaces, and road construction.
Provision of 12m flatbed truck for transporting up to 23 empty crates efficiently and safely.