Bawrkan Water Project
Ongoing Projects

Bawrkan Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800 meters, with varying diameters 2- Concrete Water Tanks: (12m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026
Sawa Water Project
Ongoing Projects

Sawa Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: meters, with varying diameters 2- Concrete Water Tanks: (10m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026
Knak Water Project
Ongoing Projects

Knak Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800meters, with varying diameters 2- Concrete Water Tanks: (12m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026
Kuna Sixwr Water Project
Ongoing Projects

Kuna Sixwr Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800meters, with varying diameters 2- Concrete Water Tanks: (12m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026
Tassu Valley Water Project
Ongoing Projects

Tassu Valley Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800meters, with varying diameters 2- Concrete Water Tanks: (12m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026
Blingry Water Project
Ongoing Projects

Blingry Water Project

This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works. The scope includes: 1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800meters, with varying diameters 2- Concrete Water Tanks: (12m x 10m x 2.1m) 3- Pump Chamber & Electrical Works: Installation of a dedicated pump chamber and associated electrical systems to support operations

Soran District Soran 2026