This infrastructure project involves the construction and installation of a complete water distribution system, including pipelines, storage tanks, pumps, and electrical works.
The scope includes:
1- Pipeline Network: HDPE Pipe PE100 SDR11 TWPASS1075 – Total Length: 2,800 meters, with varying diameters
2- Concrete Water Tanks: (12m x 10m x 2.1m)
3- Pump Chamber & Electrical Works:
Installation of a dedicated pump chamber and associated electrical systems to support operations